Popcorn Ceiling Removal in Gardena

Typical cost in Gardena

  • One room, about 150–250 sq ft of ceiling$1,500 – $4,000+
  • Several rooms, about 600–1,000 sq ft of ceiling$4,000 – $9,000+
  • Whole house, about 1,200–2,000 sq ft of ceiling$7,500 – $17,000+

Nothing gets scraped until a sample is back. If the lab finds asbestos in the texture, we seal off the room, take the texture down and bag the waste for disposal, and patching and finishing follow as a separate job.

Rule 1403 calls for a survey before renovation, and taking down a ceiling is renovation. Please leave the ceiling as it is until the results are back, and do not scrape, sand or sample it yourself.

Request a free quote
Empty living room with a textured ceiling, beige carpet, curtains and a sliding glass door looking onto trees

Ceiling jobs we handle

One room

A bedroom or living room ceiling is a job on its own, with that room sealed off. If the texture tests positive and the work involves 100 square feet or more of it, the employer doing the job needs a Cal/OSHA registration first.

Several rooms or a whole floor

Larger ceiling areas are surveyed room by room, and the district notice goes in before any room is opened. The results for each room are on record before the job is priced.

Painted or stained texture

A coat of paint or a water stain does not tell you what the texture holds. The sample does, and the result decides whether the ceiling is taken down or left alone.

A ceiling you are keeping

A ceiling that stays untouched needs no removal. Testing comes into play when a renovation is about to disturb it, and that is the point to ask for the survey.

Planning around a ceiling job

A ceiling job closes a room, so it helps to line things up in the right order.

Results before the painter

Book the finisher after the results are in. A positive ceiling has to come down before anyone patches, retextures or paints it.

The notice sets the start

The district notice has to be submitted no later than 10 working days before the renovation, so plan on at least 10 working days from filing to the first day of work. We file it online for you, and a renovation that removes less than 100 square feet of surface area of the material is exempt from notification.

Finishing is a separate job

Removal leaves a bare ceiling. New texture, patching and paint are their own step, scheduled and priced apart from the removal.

Empty room with plastic sheeting over the walls and windows, a wood floor and a blue-gray portable air machine with a hose

Ceiling results come from asbestos testing, and the home page has our other services.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (424) 373-8130

Call (424) 373-8130