Asbestos Removal in Gardena

At Gardena Asbestos Removal, we make asbestos removal quick and easy for homeowners and property managers alike. Our proven methods include a decade of experience, reliable professionals, guaranteed work, and affordable pricing. Call now for a free, personalized quote, no obligation.

For us, every project is unique and we always focus on your home's needs. Whether you are refreshing one unit or preparing a larger renovation, we begin with the building's use and the desired end result. Flooring, ceiling finishes, insulation and exterior materials all get their own place in our careful planning. Scroll down to learn more about asbestos removal and our unique approach.

Pale one-story stucco house with a low roof, a trimmed hedge along the front, an attached garage at the right and a wide lawn under a clear sky
Asbestos testing and surveysPopcorn ceiling removalFloor tile and mastic removalDrywall, joint compound and plaster removalHVAC duct and pipe insulation removalRenovation and demolition abatement

Our asbestos services

Entry and stairway of a split-level house with small square patches on the ceiling and walls and a few white items on a stepEmpty living room with a textured ceiling, beige carpet, curtains and a sliding glass door looking onto trees

Asbestos testing and surveys

Rule 1403 of the South Coast Air Quality Management District wants the building surveyed prior to any demolition or renovation. We line that up. The sampling is handled by an asbestos consultant or technician certified by Cal/OSHA who has taken the EPA Building Inspector course, and you receive a written report listing what was taken, from where, and what the lab found. The report is yours to keep and to hand to any remodeler who bids on the work.

Popcorn ceiling removal

A sprayed ceiling is sampled before it is touched. A positive result means the room gets sealed, the texture comes down and the waste is bagged for disposal. Patching and repainting come afterward as their own job.

Garage with painted block walls and a utility sink at the left, old patterned vinyl flooring over much of the floor and bare concrete at the lower leftWall opened up around an electrical panel, with plastic sheeting taped at the edges and spread over the floor

Floor tile and mastic removal

Tile, sheet vinyl and the mastic beneath them each get sampled, because the survey goes through every flooring layer to the joist. Layers that test positive are lifted inside a sealed work area. Ask for the lab result before you agree to a scope of work, since it tells you which layers are involved.

Drywall, joint compound and plaster removal

A remodel that opens a wall puts drywall, joint compound and plaster in play. The survey samples the wall and ceiling material the work will reach, including what sits in the cavities, and anything that tests positive comes out under containment.

Attic with silver-gray round ducts running along the rafters, a plank walkway down the middle and loose insulation at the sidesEmpty room with plastic sheeting over the walls and windows, a wood floor and a blue-gray portable air machine with a hose

HVAC duct and pipe insulation removal

Swapping out a furnace, air handler or duct run is renovation as Rule 1403 defines it, since the definition takes in installing or removing heating, ventilation and air conditioning systems. If duct wrap or pipe insulation tests positive, it comes out first and the new equipment goes in afterward. Your heating contractor handles the equipment, and we handle the insulation ahead of it.

Renovation and demolition abatement

Remodels, additions and teardowns begin with the survey. Every demolition also needs a district notice, and so does pulling out a single load-supporting wall, since the rule counts that as demolition.

Asbestos testing and removal costs

More than 7 in every 10 Gardena homes were built before 1980, making asbestos a common issue in our community. Our price ranges cover hired labor, materials, containment, lab fees and disposal for typical jobs in Gardena, Lawndale and Lomita. Expect the low figure for a small job with easy access, and the top for bigger areas, occupied buildings, second stories or extra air tests.

Asbestos testing and surveys

  • Testing for a small remodel, a few samples$400 – $800+
  • Whole-house survey before a remodel or demolition$600 – $1,500+
  • Air test after removal (clearance)$400 – $1,000+
What is included

Sampling by a Cal/OSHA-certified consultant or technician, an accredited lab reading of each sample and one written report. The air test after removal is run by an independent consultant.

Get a free quoteSee an example project

Popcorn ceiling removal

  • One room, about 150–250 sq ft of ceiling$1,500 – $4,000+
  • Several rooms, about 600–1,000 sq ft of ceiling$4,000 – $9,000+
  • Whole house, about 1,200–2,000 sq ft of ceiling$7,500 – $17,000+
What is included

The room covered in plastic with air filters running, the texture soaked and scraped into bags, a final cleanup and the haul. Skim coating, new texture and paint are extra.

Get a free quoteSee an example project

Floor tile and mastic removal

  • One bathroom or laundry floor, up to about 100 sq ft$1,200 – $3,000+
  • Kitchen floor, about 200–300 sq ft$2,000 – $5,000+
  • Several rooms of flooring, about 1,000 sq ft$5,000 – $12,000+
What is included

The work area sealed, tile or sheet vinyl lifted, the black mastic beneath removed where it tested positive, bags hauled out and the room cleaned. A new floor is not included.

Get a free quoteSee an example project

Drywall, joint compound and plaster removal

  • One wall or a new doorway, under 100 sq ft$1,200 – $3,000+
  • One room of walls, about 350–450 sq ft$3,000 – $7,000+
  • Whole-house walls and ceilings, about 1,500 sq ft home$15,000 – $40,000+
What is included

Plastic containment and air filters, the wall or ceiling material that tested positive removed wet, bagged and hauled, then a cleanup. New drywall and paint are separate.

Get a free quoteSee an example project

HVAC duct and pipe insulation removal

  • Duct wrap at the furnace or a few duct joints$1,200 – $3,000+
  • All attic ducts in a house, removal only (new ducts extra)$2,500 – $6,500+
  • Pipe or boiler insulation, up to about 50 ft$1,000 – $2,500+
What is included

A sealed work area in the attic, closet or pipe run, positive wrap or tape removed and bagged, and a cleanup. New ducts or insulation are a separate price.

Get a free quoteSee an example project

Renovation and demolition abatement

  • Kitchen or bathroom remodel, one or two materials$2,000 – $5,500+
  • Whole-house remodel or teardown, several materials$15,000 – $40,000+
What is included

The positive materials come out before the remodel or demolition crew begins, with containment, disposal and a cleanup. The survey and the district notification fee are billed on top.

Get a free quoteSee an example project

Stucco removal

  • Stucco around one window or door$1,200 – $3,000+
  • Stucco on one wall or an addition, about 200–400 sq ft$3,000 – $8,000+
  • Stucco on a whole house, about 1,500–2,000 sq ft of wall$15,000 – $40,000+
What is included

Plastic around the work area, positive stucco cut out wet, bagged and hauled, and a cleanup. New lath, stucco or siding is not included.

Get a free quote

Cement siding removal

  • Cement siding on one wall or a garage, about 200–400 sq ft$2,000 – $5,000+
  • Cement siding on a whole house, about 1,500–2,000 sq ft$11,000 – $24,000+
What is included

Whole pieces taken off by hand and kept wet, wrapped and sealed, then hauled with a cleanup of the grounds. New siding is extra, and roofing is priced after a roof visit.

Get a free quote

Ranges are 2026 estimates, not quotes. Call today for a free, personalized quote.

Houses and apartment buildings

Gardena’s housing splits unevenly. A little over half of Gardena’s homes are one-unit homes, nearly 3 in every 10 live in larger buildings of five units or more, and a little over half of households rent. A single remodel call can come from a house owner, a landlord or a property manager, and each one starts in the same place.

Rule 1403 does not care whether the building is a house or an apartment complex, because any residential structure counts as a facility. The rule does draw a line elsewhere. By its definition, residential single unit dwellings do not include apartment buildings, townhouses or condominiums, and that line decides who can use the small-job survey exemption described in the questions below.

Mobile homes in the housing mix

Mobile homes account for 5.7 percent of Gardena’s housing units. Rule 1403 carves out nothing for mobile or manufactured homes, so one being renovated or demolished is surveyed like any other building. If you are not sure how your home is classified, call us and we will go through it with you.

If you own one, call us with the address and what you plan to change, and we will tell you which steps apply.

Housing in Gardena

Over 71 percent of Gardena’s homes were built before 1980, and 15.3 percent were built before 1950. The years from 1950 through 1979 produced more than half of the homes in the city today.

Half of Gardena’s homes were built in or before 1964. No build-year cutoff applies to the survey, which means a home from the 1990s or later is covered just as a 1950s home is. A newer date on the building does not remove the survey step.

Testing before you hire a remodeler

Line up the survey before remodeling bids come in. Under Rule 1403 the building is thoroughly surveyed for asbestos ahead of demolition or renovation, which means the work waits until the survey is done.

Without a survey, a remodeler is bidding on walls and ceilings nobody has looked inside. With one, the bid reflects the samples, including every flooring layer to the joist, plus whatever is inside the walls and ceilings. Ask the remodeler to wait for that report before putting a number on the work.

A negative result covers only the materials that were sampled. Another wall or a later project needs its own answer.

Our process

01

Survey and samples

We start with the survey. A Cal/OSHA-certified asbestos consultant or technician looks at the areas you plan to change, samples what needs sampling and sends the samples to a lab. You get a written report of what was sampled, where and the result.

02

District notice and containment

With the results in hand, we file the district notice online through the Rule 1403 Notification Web Application. It has to reach the district no later than 10 working days before the work, with the district’s notification fee, so plan on at least 10 working days. We then seal the work area with plastic.

03

Removal, air test and disposal

Removal follows the district’s work rules for whatever tested positive. If the job calls for a clearance air test, an independent consultant runs it, because California bars removal contractors from clearance air monitoring. Friable waste goes out classed as hazardous, carried by a licensed hauler under a manifest, and the load leaves with that paperwork.

Demolition permits in Gardena

Gardena’s Building Services page says demolition work needs a building permit. The page does not mention asbestos, so the asbestos side follows the district’s notice rule and state law.

State law, according to the district, puts one more step in front of a demolition permit. The local building department gets a copy of the South Coast AQMD demolition notification, and because we file that notice online, the copy is ready as soon as it is submitted.

Rules are applied address by address, so ask the building department about permits. Rule questions go to the district’s asbestos hotline, (909) 396-2336. Nothing on this page is legal advice, and a call to either office is how you confirm what applies at your address.

Serving Gardena, Lawndale and Lomita

We also serve Lawndale and Lomita. Call us for confirmation if your address is outside the area.

Frequently asked questions

Does the district let an owner do the work?

The rule has a narrow exemption, though the district itself would rather you did not use it. It leaves out an owner-occupant of a residential single-unit dwelling who does the renovation personally. That means renovation only, never demolition. You must live in the house, you must do the work yourself, and laborers, friends and family members do not count as helpers. The house is not vacant and is neither a rental nor a business, which rules out landlords. Condominiums, townhouses and apartments are not single-unit dwellings. Waste put outside the house stays under the rule, and the district advises against a home-owner removing asbestos, citing possible exposure and cross contamination. Please do not take samples yourself.

Can a small job skip testing or the notice?

There are two carve-outs for small jobs, and demolition is excluded from both. The notification exemption covers a renovation where the asbestos-containing material removed or stripped adds up to less than 100 square feet of surface area, whatever the building type. The survey exemption is narrower, limited to renovations of residential single-unit dwellings that stay under that same less than 100 square feet of surface area. Work practices and waste rules continue to apply either way, and testing is how you find out the amount.

Who files the district notice?

That is our job. The abatement contractor files the notice with South Coast AQMD through the district’s online application, and the filing date is the part that counts. It must land no later than 10 working days before any demolition or renovation activities, and the district does not treat it as received until the notification fee comes with it. Any demolition requires a notice.

What should I check before hiring a contractor?

Two agencies are involved. Cal/OSHA requires the employer to hold a registration before starting work involving 100 square feet or more of surface area of asbestos-containing materials, and an employer outside that rule files a Report of Use. The Contractors State License Board adds a licensing test, so ask for the CSLB license number and look at what it covers, not only whether it is active. For that size of work, the contractor needs a C-22 Asbestos Abatement classification, or have a qualifier on the license who passed the asbestos certification exam.

Where does the waste go?

Waste leaves a job in different condition, and the condition decides the route. Material that is friable, powdered or finely divided is hazardous waste in California and goes with a licensed hauler and a manifest. Floor tile that has not become friable is outside that rule, although other agencies may still restrict it, so it is not tossed in with ordinary trash.

Request a free asbestos removal quote

We recommend calling, but do feel free to contact us using this form. We'll get back to you with a free, personalized quote or additional questions as soon as possible. We're here to help.

Call (424) 373-8130

Call (424) 373-8130