A floor job is easier to plan once you know the number of layers down to the subfloor.
Every layer gets sampled
The survey is meant to reach every layer of flooring, down to the joist. Picture sheet vinyl over tile over a subfloor, and you get a result for each layer, not a single answer for the floor. Knowing the layers early keeps the scope of the job from changing halfway through.
Wet removal for tile that holds together
Procedure 3, the district’s wet removal method, may only be used on nonfriable material, so flooring that has turned friable is not eligible. Ask before work begins which method the crew plans, since the answer depends on the lab result.
The waste rule
Floor waste is sorted by condition. California’s hazardous waste table for asbestos does not reach floor tile that has not become friable, although other agencies might still limit it. Waste that is friable, powdered or finely divided is hazardous and ships with a licensed hauler under a manifest, so a job with both kinds produces two streams.